0137 - Shanghai Baoshan Steel Complex To Begin Production. Along the 1600 m...Back
Shanghai Baoshan Steel Complex To Begin Production. Along the 1600 metre long conveyor bridge of the Baoshan iron and steel works, four pipes are used to transport iron ore and coal to the raw materials depot. Photo by Zhang Ping
Image details
Front | No |
---|---|
Place | |
Year | 1985 |
Looking for a copy of this image?
Please contact us to request a print or digital download.